EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
RANS21RB
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (679)
Research
Workshop
- (4)
Empennage
- (37)
Fuselage
- (155)
Firewall
- (19)
Tail Feathers
- (4)
Wings
- (99)
Controls
- (20)
Avionics
- (52)
Lighting
- (9)
Instrument Panel
- (8)
Landing Gear
- (6)
-
Main Gear
-
On the gear
-
Gear leg install
-
Tailwheel
-
Wheel, Brake and Tires
-
Wheels and Brakes
Engine
- (82)
Propeller
Fuel System
- (6)
Interior Finish
- (28)
-
Wiring and paint prep
-
Wing wires and...
-
Seats
-
Center console,...
-
Center Console
-
Paint
-
Side panels
-
Interior Trim panels
-
Wiring
-
Finish work
-
Wiring and trim panels
-
Brake Lines
-
Interior panels and...
-
Floorboard carpet...
-
Prep
-
Center Console
-
Rear Rudder Return...
-
Fresh Air Vents
-
Completed Interior...
-
Flap Handle Closeout
-
Cockpit trim panels
-
Cockpit
-
Cockpit interior
-
Interior Closeout...
-
Interior closeout...
-
Control Stick and...
-
Interior Closeout...
-
Closeout panels
Paint / Decals
- (90)
Inspection
- (4)
Tools
Inventory
- (3)
Kit Delivery
- (1)
Reassembly
- (52)
Builder Name:
Randall Brooks
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
1991
Total Flight Time:
Start/Last Date:
Apr 03, 2021 - No Finish Date
Engine:
Titan IO-340 180HP
Propeller:
Whirlwind
Friendly URL:
https://eaabuilderslog.org?s=RANS21RB
Home or Last Project Picture
Jun 23, 2022
Wheels and Brakes
- (2 hours)
Category: Landing Gear
Installed tube in second tire. Packed all wheel bearings with Mobil 28 aircraft grease. Assembled 2nd brake assembly. Torqued wheel and disc hardware.
Both wheels ready to assemble onto gear legs.
Wheel Brearings packed with Mobil 28 Grease.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.